
Add to Cart
MDF CD DVD Storage Rack Decorative Wooden Cabinet Wood Floor Cabinet Gas Pump Red Color
These wooden floor cabinet / gas pump with red color is 23x23x87cm / 24x19x72cm / 18x50cm.It is crafted of handmade and MDF finished in mix color for unparalleled pop of color.The top part is polyresin material.When we packing, we take the top off and put it in the cabinet, which can better protect the product and save the container space.
1. Product type:CD holder/Wooden cabinet
2. Material: MDF
3. Number of shelves:4 layers
4. Color: Black,cutom made color is acceptable.
5. Production technical:Hand painting
6. Size:item no.5658B, 23x23x87cm; 5660C, 24x19x72cm; 5714, 18x50cm.
Item no. | 5658B / 5660C / 5714 |
Application | house,restaurant and all kinds of shop |
Shape | Creative shape |
Wire | Included,we can make Europe standard,American standard and Asia standard |
LED light | Not included |
Style | Retro |
Nearest port | ShanTou |
1. 1 pc per carton;
2. Packed by bubble bag,then put into carton;
3. Normal carton size:item no.5658B, 73x25x25cm,0.046cbm; 5660C, 57x26x21cm, 0.031cbm; 5714,39x20x20cm, 0.016cbm.
MAIN ORDER | |
---|---|
Terms | FOB SHANTOU |
Delivery Time | About 45 days after deposit |
Confirm | Confirmed PI |
Payment | 30% Deposit , 70% against BL COPY |
Star Production | After receiving deposit |
Marks | Provide by customer and we will send the draft for customer confirm |
Shipment | We will contact your forwarder and arrange the sea shipment |
Inspection | We will send the inspection for your confirm before loading |
Documents | Will send the draft for your confirm after loading and send the original documents once receive the balance payment |
• Sample Rules
1. Sample lead time: 7-10 days;
2. Freight collect;
3. Customization is welcome;
4. Sample charge is subject to the sample quantity and sample amount;
6. Sample Packing:Mail package OR strong package.
Q: What is the delivery time?
A: Usually, the delivery time is 45 ~ 50 days. But, if you place the order in Jan or Feb, the delivery time will take 20 ~ 30 days more, because our factory will be on holiday for Chinese New Year in Feb.
Q: Can you change the color or surface finish?
A: Yes, we can. Just tell us what you want, or give us a sample for reference.
Product photo show: