
Add to Cart
Red Color Antique Post Box Storage Cabinet Wooden Floor Rack MDF CD DVD Storage Cabinets
The round red CD rack size is 23x23x48cm.Decorate your house with this CD cabinet and decorative wooden cabinet in red color,give the sweet house a good retro look.The CD rack is hand painting artwork ,and it is practical ,unique,nice cabinet.It's classic antiqued red color,meanwhile,it's nice to match in shop,home,club and so on.Our products are hign quality,and we accept your QC come to inspection goods.Moreover,you can mix different color and different shape CD rack in one container.
1. Product type:CD holder/Wooden cabinet
2. Material: MDF
3. Number of shelves: 2 layers
4. Color: Antiqued red ,cutom made color is acceptable.
5. Production technical:Hand painting
6. Size:23x23x48cm
Item no. | 5724A |
Application |
house,restaurant and all kinds of shop |
Shape |
Round |
Wire | Included,we can make Europe standard,American standard and Asia standard |
LED light | Not included |
Style | Retro |
Nearest port |
ShanTou |
1. 1 pc per carton;
2. Packed by bubble bag,then put into carton;
3. Normal carton size:50x24x25cm,0.03cbm;
4. 1x40GP container capacity:1900pcs
MAIN ORDER |
|
---|---|
Terms | FOB SHANTOU |
Delivery Time | About 45 days after deposit |
Confirm | Confirmed PI |
Payment | 30% Deposit , 70% against BL COPY |
Star Production | After receiving deposit |
Marks | Provide by customer and we will send the draft for customer confirm |
Shipment | We will contact your forwarder and arrange the sea shipment |
Inspection | We will send the inspection for your confirm before loading |
Documents | Will send the draft for your confirm after loading and send the original documents once receive the balance payment |
• Sample Rules
1. Sample lead time: 7-10 days;
2. Freight collect;
3. Customization is welcome;
4. Sample charge is subject to the sample quantity and sample amount;
6. Sample Packing:Mail package OR strong package.
Q: What is the loading port?
A: The loading port is Shantou, which is the nearest to our factory. But, if you want to ship the goods from other ports like Shenzhen, it is fine for both of us to negotiate.
Q: What is the delivery time?
A: Usually, the delivery time is 45 ~ 50 days. But, if you place the order in Jan or Feb, the delivery time will take 20 ~ 30 days more, because our factory will be on holiday for Chinese New Year in Feb.